Using Revit as a Team. Use Same Builds.

When using Revit on a project, make sure everyone on the team is using not only the same version, (2011, 2012, etc), but the same build number as well.  The build number can be found by clicking on the question mark pull down in the upper right corner, and click the About button….

From there, you’ll see the splash screen of the version, and the build.  The first 4 numbers in the year the build was released, (2010) The next 2 are the month of the release, (09-September), the next 2 are the day of the release, (03-third).  The last four are the actual build number 2115, and the service pack number is new to the newer versions.  Might not be shown for earlier versions.

 


I’ve seen fatal errors in Revit when teams are using the same version, but different build numbers, and users are syncing their builds local file to the central file, and the central file is receiving updates from multiple builds, when there have been some changes to the software code, and there is a discrepancy  between two items, one new version, one old version, and Revit doesn’t know what to do. 

In order to make sure everyone is using the same build, everyone should be using the latest build.  For 2011, its build 20100903_2115 Web Update 2 Service Pack.  For 2012, it’s build 20110916_2132 Update Release 2.

Monday, March 21, 2011

Book Review: Mastering Autodesk Revit MEP 2011




Revit MEP has been out since August 2006, or almost 5 years now.  And new versions are usually released in mid-April.  This coming version will be the 7th release.  While the software has been around for a while, there hasn't been any good advanced documentation or books on the software.  In 2008, while attending AU, I was approached by a book publisher to write a Revit MEP book because so many people were asking for one, and none existed.  While I was excited about the opportunity, I couldn't find time in my schedule with a two year old and a newborn.

Over the last year, I've started to see some new books come out on Revit MEP.  But the one that is above the others is this one by Don Bokmiller, Marvin Titlow and Simon Whitbread.  I've done Revit MEP training with the AOTC courseware since the software was first released in 2006, and I wish that I had a resource like this book to train from.  While there is a learning curve of the basics, this book takes users to the next level and shows how Revit MEP is used in real world projects from start to finish, and not just showing you how to do a couple simple tasks that are part of a smoke-and-mirrors dataset.

I always say there are two types of people looking for knowledge on Revit MEP, and you must adjust your training accordingly.  There is the end user, who wants to know how do connect equipment, duct, pipe, lights, etc and read the engineering data that is generated from those connections.  Then there is the BIM manager, who wants to know how to get the equipment and connections to display correct for construction documents, and the engineering data to calculate correctly, and get projects to run quickly and efficiently.  But sometimes knowledge of how Revit works in the background is helpful for both types of end users of the software. And this book accomplished that.

While some books only apply to one type of Revit user, I really recommend this book for all users of Revit MEP.  It's in depth, and applies to all types of Revit users.  Even when a new Revit software version is released, this book will still be relevant.

This paperback book can be purchased directly from the publisher here:

or an Adobe E-Book can be purchased and downloaded from the publisher here:

or a paperback book from Amazon here:

AutoCAD Revit MEP Suite
  • VER      BUILD                NAME     
  • 1.0       2006 04 01    (Revit Systems 1) (1)
  • 2.0       2006 09 01    (Revit Systems 2) (2)
  • 2008    2007 04 12    (Revit MEP 2008, AutoCAD MEP 2008) (3)
  • 2009    2008 04 15    (Revit MEP 2009, AutoCAD MEP 2008) (4)
  • 2010    2009 04 16    (Revit MEP 2010, AutoCAD MEP 2010) (5)
  • 2011    2010 04 16    (Revit MEP 2011, AutoCAD MEP 2011) (6)  

Saturday, May 15, 2010

Troubleshooting Revit MEP

A 20 minute video from Autodesk's Harlan Brumm and Jerry Lee Smith covering:

Overview of the Revit MEP Workflow
  • Create new project using MEP template
  • Save Arch model as central file on server
  • Link in models using origin-to-origin
  • setting links to be room bounding
  • copy/monitor levels
  • Setting up views and apply view templates to views
  • create levels to account for plenum spaces
Troubleshooting Spaces and Zones
  • space not visible in view
  • rooms are "unoccupied"

Troubleshooting Revit MEP Performance
  • Not following workflow
  • not creating logical systems
  • large connected duct networks
  • complicated families
  • poorly connected elements
  • Limit color schemes
  • place endcaps on open ducts
  • ensure flow direction on connectors is correct


Wednesday, March 31, 2010

Automatic Transfer Switches in Revit MEP

http://inside-the-system.typepad.com/my_weblog/2010/03/automatic-transfer-switches.html

Automatic Transfer Switches in Revit MEP

by Martin Schmid, P.E. - MEP Customer Success Engineer


How do I incorporate an automatic transfer switch (ATS) into my electrical distribution model? Revit doesn’t have a family category for transfer switch, nor does it have a transfer switch part type for the Electrical Equipment category. Nonetheless, you can modify the provided “Automatic Transfer Switch.rfa” family that ships with Revit MEP 2010 to allow you to connect an emergency panel to both a normal power branch and an emergency power branch.

Say, for example, you have emergency loads, such as certain receptacles, connected to a panel EP1. You want to connect EP1 to an ATS, and then connect the ATS to an emergency distribution panel EDP, and a normal distribution panel MDP. Follow the steps below to make the necessary changes to the ATS family.

  1. Open the “Automatic Transfer Switch.rfa” family in family editor.
  2. Add an additional electrical connector. What surface you place it on does not matter.
  3. In the Instance Properties for the new connector, set the following properties (basically, copying the settings from the existing connector):
  4. Number of Poles > map to Number of Poles
  5. Load Classification: set to Other
  6. System Type: set to Power – Unbalanced
  7. Voltage > map to Switch Voltage
  8. Apparent Load Phase 1 > map to Apparent Load Phase A
  9. Apparent Load Phase 2 > map to Apparent Load Phase B
  10. Apparent Load Phase 3 > map to Apparent Load Phase C
  11. Load the family into your project, overwriting the existing family if applicable.
Make sure to check the voltage settings are consistent between the ATS and the panels you are connecting.

Now, you can connect EP1 to the ATS, and connect the ATS to both EDP and MDP. When you inspect the load information on EDP and MDP, you should see that the load information from EP1 feeds into both. The ATS doesn't actually 'switch' from normal to emergency in Revit, however, it should provide you with the connected load information you are looking for.

Thursday, March 18, 2010

Autodesk Publishes Framework to Help AEC Professionals Implement BIM Process

The Autodesk BIM Deployment Plan is a Free, Web-accessible Resource Offering Tools and Guidance Based on Real-World Practices for building industry professionals interested in implementing Building Information Modeling (BIM). Tools offered in this resource provide a practical framework for AEC stakeholders, and can be used by individual organizations on specific projects. The BIM Deployment Plan includes:

  • BIM support materials for owners, architects, engineers, and contractors
  • Templates to streamline multi-discipline communications
  • Recommendations for roles and responsibilities
  • Best business process examples
  • Software suggestions for an effective BIM environment
DOWNLOAD the BIM Deployment Plan Here

SAN RAFAEL, Calif - Autodesk, Inc has announced the availability of its Autodesk BIM (Building Information Modeling) Deployment Plan: A Practical Framework for Implementing BIM, a new web-accessible resource for building industry professionals. Aimed at all AEC stake-holders, including owners, architects, engineers and contractors, the free guide includes support materials and a framework based on real-world applications of BIM. Tools offered include templates to help manage multi-discipline communications within a BIM project, as well as suggestions for the roles and responsibilities of each party in a BIM process-based project, best business process examples and suggested software to support an effective BIM environment.



“The BIM Deployment Plan is helping us develop a BIM implementation process best suited for the technology needs of the project and tailored to the abilities of the players involved. It is also helpful in defining clear roles and responsibilities for the execution of workflows on our jobs.”



As the building industry continues to evolve, technologies such as visualization, simulation and analysis are fundamentally changing how projects get delivered. Now more than ever, collaboration and transparency are essential and effective for anticipating and reducing problems related to cost overruns, schedule, scope and quality. Autodesk has been at the forefront of BIM technology adoption including the creation of a portfolio of software products that facilitate a BIM solution.



“New technology is creating enormous opportunities for the building industry to improve processes and outcomes, and many organizations still need guidance on how to share information as well as streamline project communications,” said Phil Bernstein, FAIA, Autodesk vice president of building industry strategy & relations. “The Autodesk BIM Deployment Plan was designed to help companies navigate the entire process via one collaborative framework and subsequently deliver projects faster, more economically and with reduced environmental impact.”



“As strong advocates of BIM, we can develop building design strategies that are extremely well integrated and coordinated, substantially increasing our efficiency and lessening the building time – all of which allow us more time to create inspiring designs for our clients,” said Dick Thomas, vice president at SHP and executive director of 2enCompass. “Now taking this a step farther, The Autodesk BIM Deployment Plan has helped us further advance BIM project implementation by better documenting stakeholder roles and responsibilities and most importantly, helping us deliver the right information from the project model to the right people at the right time to drive our project forward.”



“Communication and collaboration amongst strategic team players is vital to the success of our projects,” said Mark Konchar vice president at Balfour Beatty Construction, Washington division. “The BIM Deployment Plan is helping us develop a BIM implementation process best suited for the technology needs of the project and tailored to the abilities of the players involved. It is also helpful in defining clear roles and responsibilities for the execution of workflows on our jobs.”

Friday, December 18, 2009

Implementing Autodesk® Revit® MEP: A to Z

Implementing Autodesk® Revit® MEP: A to Z


Event Year: Autodesk University 2009
Class ID: MP322-1

Primary Speaker: Todd Shackelford

Class Information
Class Type: 90-Minute Class
Expertise: Intermediate
Industry: Building
Primary Track: MEP Design and Engineering
Primary Software: Revit MEP

Class Audience
CAD managers, IT managers, and engineering professionals

Class Description
This class will outline a framework for transitioning to Revit MEP. From setting expectations and defining goals for Revit, building information modeling (BIM) and integrated project delivery (IPD) to plotting the construction documents, we will walk through the checklist of elements required to help Revit really work in your office. Along the way, this class will demonstrate how to defuse the landmines of a Revit implementation, and some clever Revit tricks will be exposed to smooth the transition.

Key Learning

  • Understanding the role of Revit MEP in BIM and IPD
  • Creating a Revit MEP template for success
  • Creating MEP Families that work for you
  • Revit MEP transition tips
  • What not to do

Wednesday, September 16, 2009

COMPUTATION AND CRAFT: SARUP TECHNOLOGY LECTURE SERIES - FALL 2009

Below is a link to this year’s schedule for the UWM SARUP Computation and Craft Lecture Series…

UW-Milwaukee School of Architecture & Urban Planning (SARUP)

All lectures occur on Thursdays, 12-1:30 pm, at Eppstein Uhen Architects: 333 East Chicago Street in the Third Ward, Milwaukee, WI 53202.

Lectures are free and open to the public. 1.0 AIA / Continuing Education System Learning Unit awarded for each lecture.

SEPTEMBER 24 :
Zero Carbon Case Studies -
James Wasley
James Wasley is an Associate Professor at UW-Milwaukee and is the SBSE Principal Investigator for the Carbon Neutral Design (CND) project, a joint effort by the AIA and the Society of Building Science Educators (SBSE) to produce educational and resource materials for carbon neutral design. This presentation will highlight case studies that relate to the CND project.

OCTOBER 8 :
Sustainable Curtainwall Design Case Study -
Chris Stutzki, Ph.D.– Stutzki Engineering
Stutzki Engineering, Inc. (SEI) is a consulting firm offering engineering services for architects and building contractors, in the field of structural glass, lightweight structures and building facades- combining state-of-the-art engineering and applied science with creative industrial design. This presentation will highlight an advanced sustainably-focused envelope design for a law school building in Baltimore, on which Stutzki is working in association with BEHNISCH Architekten and TRANSSOLAR.
OCTOBER 15 :
BIM–The Engineering Perspective -
Jerry Packham, Project Manager and Kyle Hansen, Designer Affiliated Engineers, Inc.
Jerry Packham and Kyle Hansen, of Affiliated Engineers, Inc. (AEI), are integrally involved in the firms use of Building Information Modeling (BIM) based technologies and processes to improve project delivery and project performance. This presentation will highlight AEI’s use of BIM from an engineering perspective and will feature examples from projects AEI has delivered utilizing BIM and other related methodologies.
NOVEMBER 5 :
Integrated Project Delivery: Real World Projects -
Mike Whaley, Director of Preconstruction Services – J.H. Findorff & Sons Inc.
Mike Whaley leads Findorff’s preconstruction services and as a result is intimately familiar with virtual construction, Building Information Modeling (BIM) and Integrated Project Delivery (IPD). This presentation will highlight real-world projects, including the Wisconsin Institutes for Discovery project under construction at the University of Wisconsin, where these techniques and technologies have been utilized and have made a difference.
NOVEMBER 12 :
SC Johnson Project Honor – Pioneering in Value Based Design and Construction
Kevin Bredeson – Director of Virtual Construction – Gilbane Building Company
Tracy Lutterman – Construction Project Manager, Corporate Facilities – SC Johnson Company
Jason Chandler – Project Manager – Epstein
Designed by world renowned architect Foster + Partners in association with Epstein, and constructed by Gilbane Building Company, Project Honor utilized a unique, collaborative approach to project delivery, The presentation will focus on the unique design of the facility and the necessary collaboration to be able to incorporate the unique design features. Emphasis will also be placed on the upfront collaboration of the integrated project team, the Building Information Model (BIM) and the use of Lean design and construction principles to maximize efficiencies in every aspect of the work.
NOVEMBER 19 :
Fast, Cheap, Better & more sustainable– Case Study in Integrated Project Delivery
Martin Sell – President – MSA Integrated Project Delivery
MSA Integrated Project Delivery recently completed the five-acre Spirit of Africa Exhibit for the International Crane Foundation in Baraboo, Wisconsin. MSA Integrated Project Delivery acted as the IPD team leader for a team comprised of 11 companies. In this presentation, Martin will discuss how using an IPD approach allowed the team to complete the project meeting all of the owner’s goals – on-time completion, financial performance more than 10% under budget, with levels of quality and sustainability beyond what was originally anticipated.

Thursday, September 18, 2008

Design West Engineering Revit MEP Success Story

Autodesk released this latest success story of a company in California that is using Revit MEP. Clients ask me if companies are using this software all the time, and I tell them yes. Not only all over the US, but locally as well. Some companies don't want to be on the leading edge, but we are getting to the tipping point where more companies are using Revit than thinking about using Revit. The key is having a good strategy and a progressive team and support from upper management.

Click Here to go to the full story posted by Autodesk

Undersea design adventure Project.

With Revit® MEP software, Design West Engineering completes construction documents for the SEA LIFE™ Aquariumat LEGOLAND®.



Design West Engineering Customer Success Story
Revit® MEP Revit®
For our clients using Revit Architecture, our original
goal was to produce 100 percent of our construction documents with Revit
MEP and we’ve already accomplished that. It really does help us run a much
tighter project and put a better product into the field. The 3D models give the
entire design team — from the project engineer on down — adramatically improved
understanding of the building. As a result, contractors can build our projects
more easily and with far fewer questions.
Robert Cronk
Principal
Design West Engineering
Firm Summary
Design West Engineering is a mechanical, electrical, and plumbing (MEP) engineering consulting firm based in San Bernardino, California. Established in 2000, the firm delivers services to clients from a wide range of building sectors, including higher education, K–12 schools, religion, and civics. “We’ll tackle almost any type of commercial engineering or energy-efficiency project,” says Robert Cronk, a principal at the firm. “Lately, we’ve also done quite a bit of multifamily residential work.” Until early 2007, Design West relied primarily on AutoCAD® software to deliver exceptional service and designs to its architectural partners. “However, we began to notice that more and more architects were using Revit Architecture software and becoming quite passionate about wanting to collaborate with us via a complete building information model.” As a result, Design West began migrating to Revit MEP software, the intuitive building information modeling (BIM) solution built specifically for MEP engineers and designers.

The Challenge
Since adopting Revit MEP, Design West has completed construction documentation on 14 major projects, including the 28,000-squarefoot SEA LIFE Aquarium at LEGOLAND near San Diego, California. “SEA LIFE is designed to introduce children to the wonders of the ocean,” says Cronk. “There’s a whole chain of them across Europe, but this project is their first U.S. venture.”

“The whole park is very heavily themed, with lots of exposed ductwork and piping that must be painted or covered with theming,” says Cronk. When designing SEA LIFE locations throughout Europe, the project architect used Revit® Architecture software. “However, because the MEP engineers on those projects were still using traditional CAD applications, they sent him 2D ductwork drawings. As a result, before the theming contractors could decorate any of the spaces, the architect had to provide interior elevations of every single wall in all of the attraction rooms so they could estimate the proper duct heights.”

Revit MEP provides instant design feedback— not a large set of error-prone documents for after-the-fact examination.

Architects are obviously concerned with aesthetics; our initial requirement is to make sure the system works properly. The Revit platform enables both of us to do our respective jobs better.

Jarrod Baumann
Project Manager
Design West Engineering
The Need for Speed
All of that work was time consuming and not very accurate. Yet the SEA LIFE project was on a fasttrack construction schedule and could not afford any delays or possible design errors. “We broke ground in late November,” says Cronk. “The goal is to have the project fully operational in late June and open to the public in time for the July 4 weekend.”

An Information Disconnect
“In the construction process, there’s often a disconnect between the information we provide the
architects and what they really understand about the ductwork systems,” says Jarrod Baumann, a project manager at Design West. “Often, we don’t resolve that disconnect until after construction begins. With Revit MEP, we hope to greatly increase the architects’ understanding of our projects long before we get to the fi eld. We want them to know exactly where our ducts are going to run and how they’ll interact with a building.”

The Solution
Right from the start, Revit MEP and its intuitive tools for system design and analysis enabled Design West to save valuable time. “The principal architect was absolutely tickled to receive our 3D Revit MEP model,” says Cronk. “He used Revit Architecture to cut a section from every single wall and quickly get all the information the theming team needed to do its job.”

Reduce Design Conflicts
“He was also able to interactively check to make sure no future confl icts existed,” says Cronk. “We already knew that we didn’t have any confl icts with the building structure, but he was able to verify that there would be no problems with the theming and the ductwork. That was a very big benefit.”

Easily Visualize MEP Designs
“Revit MEP also enabled the architects to easily visualize our designs,” says Baumann. “Architects are obviously concerned with aesthetics; our initial requirement is to make sure the system works properly. The Revit platform enables both of us to do our respective jobs better.”

Create More Accurate Designs
“Because the architects can easily see where we want to place a unit, how big it is, and what it looks like, we can quickly make adjustments based on their input,” says Cronk. “Plus, the Revit platform itself gives us instant design feedback rather than a large set of documents that someone has to carefully examine for accuracy much later. That helps us make better decisions and increases the likelihood that our MEP systems will fi t the building in the best possible way.”

Increase Understanding
“As a result, we’re starting to see that the architects have a much better understanding of our discipline,” says Cronk. “To give a specifi c example, one of our clients does a lot of multi-family residential work with Revit Architecture. Those types of buildings have very tight space constraints on the mechanical systems. Using our model, the architects easily produced shafts and soffi ts for ductwork right around the work we gave them. They absolutely loved this capability.”

Build Credibility
“Another benefi t is added credibility with the architects,” says Cronk. “Sometimes it seems as if they think we’re crying wolf when we ask for more duct space. With Revit MEP, we can quickly show them exactly where all of the space is getting chewed up. The whole interaction is more efficient and we’re able to move forward that much faster. That’s a huge benefit.”

Share a Common Model
Design West also worked closely with the SEA LIFE project’s structural engineers. “More often than not, if we have a problem fi tting the ductwork on a project, it involves the structural cavities,” says Baumann. “We used Revit MEP to determine whether we had enough space for ductwork or adequate clearance in various spaces throughout the entire project.”

Clearly Communicate Design Intent
Even on a much smaller scale, Design West has found tremendous benefi t in Revit MEP software’s 3D visualization capabilities. “For example, we recently designed a small retail space,” says Cronk. “The owner was interested in how the different displays were going to look. He was very pleased to be able to sit down in front of the 3D model, interact with it, and see exactly how the space and diff erent light fi xtures would appear in real life.”

Reduce Costs
“Based on what he learned in that meeting, the owner made signifi cant changes to the light fixtures,” says Cronk. “Because he also received some budgetary feedback from the model, he decided to cut costs by changing some of his lighting selections.” Design West also helped one of its architectural clients, WLC Architects, save money on the design of its new 60,000-square-foot offi ce building. “Using the information in our Revit MEP model, the architects were able to determine the actual cost of several different lighting packages and make appropriate budgetary decisions,” says Cronk. “They also chose the fi xtures that looked best in the space.”

Practice Green Design
“That particular offi ce building is going for LEED certification,” says Baumann. “As a firm, we’re
involved in several other sustainable design efforts, such as the Collaborative for High Performance Schools (CHPS), a spinoff of LEED focused primarily on schools. Currently, we’re designing a combination high school and middle school campus. The client wants to score incredibly high on the CHPS checklist and plans on using the Revit platform to accomplish a substantial portion of that.” In particular, Design West is experimenting with exporting geometry from Revit to various software packages for heating/cooling and lighting analysis, such as eQuest, IES Virtual Environment, and AGI 32, either with direct export/import or through GBXML.

Transform Attitudes
Revit MEP software’s 3D capabilities have had a profound impact on contractors. “One of our project managers recently presented 3D designs to a contractor who’s been building multifamily residential homes from 2D documents for more than 20 years,” says Cronk. “At first, he wondered why we’d even bothered to use 3D.”

Maximize Coordination
The fi rm’s ultimate goal is to receive very accurate structural models at the same time that it receives the architectural models. “That really enables us to do our jobs well,” says Baumann. To further minimize design coordination errors on the SEA LIFE project, Design West regularly updated its model via links to the architectural building model, the structural framing model, the aquarium tanks, and the underground tanks.

Intuitively Create MEP Systems
“At one point on the SEA LIFE project, we got into a real time crunch,” says Cronk. “The owners made dramatic changes at a time when we had pressing deadlines on other projects. Because our entire offi ce wasn’t yet trained on Revit MEP, I produced some of the immediate changes in AutoCAD to get us past the hurdle.” Later, when engineers input Cronk’s changes into the Revit model, they quickly noticed several ways to improve the AutoCAD-produced design. “Being able to spin the model on-screen made me feel like I was at the job site discussing ways to save money with the contractor,” says Baumann. “Using Revit MEP, it’s easy to take that kind of step in the office— long before getting to the field.” “But by the end of the meeting, he had to admit
that it really helped him visualize the lighting for the parking lot and courtyards,” says Cronk. “He also admitted that 3D would be even more helpful to someone without his skills. Even with his level of experience, he still thought that 3D was worthwhile— even if it required extra effort.”

Improve Workflows
As a direct result of using Revit MEP, Design West modifi ed its workfl ow in several important
ways. “For one, our project manager and Revit trainer is very quickly moving into the role of BIM manager,” says Cronk. “His job is to oversee the quality and content of the model and to make sure that it works across the entire Revit product family— throughout our office and with our partners.”

Subscribe for Maximum Benefit
After receiving early training at Autodesk University, Design West chose to participate in the Revit MEP subscription program. “There’s definitely a benefit to being able to keep up with the latest release,” says Cronk. “We also get access to additional helpful information and quick responses from the online product support team. Our subscription has been very useful to us; we certainly don’t intend to do it any other way.”
The Result
“We’re really excited,” says Cronk. “Our original goal was to produce 100 percent of our construction documents with Revit MEP for our clients using Revit Architecture and we’ve already accomplished that. It really does help us run a much tighter project and put a better product into the fi eld. The 3D models give the entire design team—from the project engineer on down—a dramatically improved understanding of the building. As a result, contractors can build our projects more easily and with far fewer questions.”


Gain Competitive Advantage
Our marketing director says that the best thing he can tell
an architect is that we use Revit MEP. We’re currently really well positioned in
the marketplace and have a distinct competitive advantage—particularly because
most other MEP firms can’t provide these services yet. We wouldn’t have that
advantage without Revit MEP.

Robert Cronk
Principal
Design West
Engineering